返回顶部
首页 > 资讯 > 错误编码 >ORA-26883: Timeout due to string Apply process “string” while merge original Capture pro
  • 929
分享到

ORA-26883: Timeout due to string Apply process “string” while merge original Capture pro

报错故障string 2023-11-05 04:11:42 929人浏览 泡泡鱼
摘要

文档解释 ORA-26883: Timeout due to string Apply process “string” while merge original Capture process “str

文档解释

ORA-26883: Timeout due to string Apply process “string” while merge original Capture process “string” and cloned Capture process “string”.

Cause: When merging two GoldenGate, XStream or Streams Capture processes, the merge needs to wait untill the Apply process of the cloned Capture process goes ahead of the slowest subscriber of the original Capture process. This wait timed out.

Action: Make sure the GoldenGate, XStream or Streams Apply process still works properly.

ORA-26883: 超时错误发生在进行Merge操作,这是一个改变oracle数据库物理结构的重要操作,因为它将两个不同的数据库文件合并在一起,所以往往发生超时错误。

官方解释

常见案例

1. ORACLE数据库可能会出现ORA-26883错误,如果用户尝试在不同的实例中合并两个不同的数据库文件,或者尝试在同一实例中合并多个数据库文件时发生超时。

2.改变了ORACLE数据库配置参数“_CORRELATED_SUBQUERY”和“_GROUP_BY”时,在合并操作中可能也会出现超时错误。

一般处理方法及步骤

1. 首先,检查错误讯息,看是哪个“字符串”导致该超时错误产生,然后仔细检查该捕获或应用进程的相关信息,以帮助定位问题。

2. 如果由于某些原因而禁用了Tnsnames.ora,改变XMLFileName,改变参数_CORRELATED_SUBQUERY和_GROUP_BY等,则在重新启用这些功能后,可以重试Merge操作。

3. 通过查看Audit Trail日志,以识别使Merge操作失败的进程,以识别并关闭这样的进程,以释放资源并解决超时问题。

4. 对于Merge子句中的索引字段,如果长度有变化,则可能会导致超时,因此检查索引字段的长度以确保它们的相等;

5. 审计数据库活动,对于特定的活动,有时可以通过减少sql查询效率来解决Merge操作的超时。

--结束END--

本文标题: ORA-26883: Timeout due to string Apply process “string” while merge original Capture pro

本文链接: https://lsjlt.com/news/533766.html(转载时请注明来源链接)

有问题或投稿请发送至: 邮箱/279061341@qq.com    QQ/279061341

猜你喜欢
软考高级职称资格查询
编程网,编程工程师的家园,是目前国内优秀的开源技术社区之一,形成了由开源软件库、代码分享、资讯、协作翻译、讨论区和博客等几大频道内容,为IT开发者提供了一个发现、使用、并交流开源技术的平台。
  • 官方手机版

  • 微信公众号

  • 商务合作