文档解释 ORA-16456: switchover to standby in progress or completed Cause: The requested operation was not allowed because a

文档解释

ORA-16456: switchover to standby in progress or completed

Cause: The requested operation was not allowed because a switchover to standby operation was either in progress or had completed.

Action: Issue the SHUTDOWN ABORT command on the database after switchover operation completes.

ORA-16456是一个可以被忽略的错误,由oracle数据库引擎发出。它仅用于表示主/备数据库开户切换时的进度。

官方解释

常见案例

一般处理方法及步骤

1.先确认复制情况,并查看相关日志,检查复制是否有问题。

2.如果没有异常,那么可以等待切换操作结束后再查看复制进度,确保数据库切换是正确的。

3.在主/备数据库之间的切换已完成后,我们可以尝试禁用和重新启用MRP,来解决ORA-16456错误。

--结束END--

本文标题: ORA-16456: switchover to standby in progress or completed ORACLE 报错 故障修复 远程处理

本文链接: https://lsjlt.com/news/529867.html(转载时请注明来源链接)

有问题或投稿请发送至: 邮箱/279061341@qq.com    QQ/279061341

猜你喜欢
软考高级职称资格查询
编程网,编程工程师的家园,是目前国内优秀的开源技术社区之一,形成了由开源软件库、代码分享、资讯、协作翻译、讨论区和博客等几大频道内容,为IT开发者提供了一个发现、使用、并交流开源技术的平台。
  • 官方手机版

  • 微信公众号

  • 商务合作