返回顶部
首页 > 资讯 > 错误编码 >ORA-44803: Plan is in transition (about to be activated) ORACLE 报错 故障修复 远程处理
  • 903
分享到

ORA-44803: Plan is in transition (about to be activated) ORACLE 报错 故障修复 远程处理

报错故障Plan 2023-11-05 01:11:02 903人浏览 安东尼
摘要

文档解释 ORA-44803: Plan is in transition (about to be activated) Cause: New plan was attempted to be created before activat

文档解释

ORA-44803: Plan is in transition (about to be activated)

Cause: New plan was attempted to be created before activating the current plan.

Action: Completely submit the current plan and activate it.

ORA-44803 是一个sql计划转变异常,它指出操作失败,说明SQL计划正在激活,正处于转变当中。

官方解释

44803, 00000, “plan is in transition (about to be activated)”

// *Cause: A SQL plan was specified for an operation, but the plan is in

// the middle of the operations required to make it the current plan.

// *Action: Wait until the plan transitions and then retry the operation.

常见案例

ORA-44803 可以在想要激活一个包被执行的时候发生,或者当某个SQL正在准备实施变化的时候也可能发生。

一般处理方法及步骤

1.停止对SQL计划所作进一步更改或者操作;

2.稍等片刻,直到SQL计划转变完毕;

3.再次尝试,重新执行相应操作。

--结束END--

本文标题: ORA-44803: Plan is in transition (about to be activated) ORACLE 报错 故障修复 远程处理

本文链接: https://lsjlt.com/news/528906.html(转载时请注明来源链接)

有问题或投稿请发送至: 邮箱/279061341@qq.com    QQ/279061341

猜你喜欢
软考高级职称资格查询
编程网,编程工程师的家园,是目前国内优秀的开源技术社区之一,形成了由开源软件库、代码分享、资讯、协作翻译、讨论区和博客等几大频道内容,为IT开发者提供了一个发现、使用、并交流开源技术的平台。
  • 官方手机版

  • 微信公众号

  • 商务合作