返回顶部
首页 > 资讯 > 精选 >Incorrect Cost for WIP Assembly Return 1
  • 460
分享到

Incorrect Cost for WIP Assembly Return 1

2023-06-05 13:06:44 460人浏览 八月长安
摘要

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文档 ID 788680.1)In this DocumentSymptomsCh

Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文档 ID 788680.1)Incorrect Cost for WIP Assembly Return 1

In this Document


Symptoms

Changes

Cause

Solution

References


Applies to:

oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
InfORMation in this document applies to any platform.

Symptoms


Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice

EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue

The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:


1. Download and review the readme and pre-requisites for Patch 7520866

bom patch/115/sql CSTLCACB.pls 115.6.115100.6 
bom patch/115/sql CSTLCASB.pls 115.3.115100.4 
bom patch/115/sql CSTPACCB.pls 115.17.115100.12 
bom patch/115/sql CSTPACSB.pls 115.8.115100.8


You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'

5. Retest the issue.

6. Migrate the solution as appropriate to other environments.

---------------------------------------------------------------------


EBS 12.1.X

To implement the solution, please execute the following steps:


1) Please download and review the readme for Patch 11805897:R12.BOM.C


2) Please apply Patch 11805897:R12.BOM.C in a test environment.


3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3


4) Please retest the issue.


5) If the issue is resolved, please migrate the solution as appropriate to other environments.


--结束END--

本文标题: Incorrect Cost for WIP Assembly Return 1

本文链接: https://lsjlt.com/news/242934.html(转载时请注明来源链接)

有问题或投稿请发送至: 邮箱/279061341@qq.com    QQ/279061341

猜你喜欢
软考高级职称资格查询
编程网,编程工程师的家园,是目前国内优秀的开源技术社区之一,形成了由开源软件库、代码分享、资讯、协作翻译、讨论区和博客等几大频道内容,为IT开发者提供了一个发现、使用、并交流开源技术的平台。
  • 官方手机版

  • 微信公众号

  • 商务合作